|
8
you are here
sectors 8 Solid
Waste Management8illustrative
Work
|
|
Solid
Waste Management: Illustrative
Work |
 |
Chemonics Egypt
has developed integrated solid waste management plans
for several medium-sized Egyptian cities. In Fayoum
City, Chemonics Egypt analyzed
waste streams, assessed the condition of the city’s waste collection
fleet, compared landfill and recycling options, reviewed city SWM
utility management and finances, and prepared a detailed project
document using the logical framework approach to set out a program of
capital and institutional improvements. For Kom Ombo and Daraw cities
in Aswan, assessment work was followed by planning, site engineering
design, contracting, and construction supervision assistance for fleet
upgrading, transfer stations, landfill, and system operation and
maintenance. Chemonics Egypt participated in assessment, planning,
design, and implementation of a hospital waste management system for
Cairo University hospitals, including development of landfill and incineration
facilities; the project’s methodology is now widely regarded as a model
for hazardous waste management projects throughout
Egypt.
In
addition to the engineering assistance delivered through its integrated
SWM project work, Chemonics Egypt provides facility-level engineering
services including soil and groundwater analyses, site appraisal, site
engineering, facility design, and operations planning for landfill and
composting plants. Chemonics Egypt prepared the detailed design,
construction drawings, and tender documents for a 31,000 m2
sanitary landfill to serve the towns of Beba and Fashn in Beni Suef
Governorate; the work covered all site facilities and infrastructure as
well as the basic landfill. Similar services were provided for the
hazardous waste sanitary
landfill for the city of Alexandria.
|
|
|
|