|
|
| Beba and El-Fashn Solid Waste Sanitary Landfill Phase I |
|
|
|
|
The project comprised the construction of a solid waste sanitary landfill to serve
the cities of Beba and El-Fashn in Beni Suef Governorate, with two cells each of
31,000 m2. The project also comprised the construction of an administration
building, a storage tank, a water distribution network, a fire fighting system, a
drainage system, a workshop/store, a weighting bridge, an electrical
distribution/lighting system, a washing station, a fence, and a surrounding ditch
for flood protection.
The scope of services included, detailed design, construction drawings and
preparation of tender documents for all above-mentioned components.
|
|
|
|
|